We are now clearing the site with the digger and bringing in back fill to raise the ground levels around the villas and bring up the levels for the swimming pools.

    

The rendering is nearly finished for the second villa and we are raising the block-work walls leading to the basement.

    

The stairs are now in place connecting the lower level with the villa.