The lower level garden areas are now finished and the top coat of back-fill is used to cover the water tanks and waste pipes. The shuttering has been placed to help protect the stone walls from any falling rocks. We have installed the electrics for the jacuzzis and the water pipes for the pool shower and garden water taps. We have compacted the top soil, placed all the steel rods and poured the final coat of concrete for the patio area surrounding the swimming pools.