The Canarian dry stone walls at the front of the villas are now finished. We have built the stone wall by the swimming pools up to the patio floor levels. We can now finish screeding the outside terraces and start laying tiles.

The trenches have been dug for the waste water pipes and we are finishing off the plumbing for the swimming pools.