Things are starting to take shape.

We have finished the foundations on the second villa. The concrete has been poured, levelled and then vibrated to take out any air bubbles.

60 cubic metres of concrete have gone into the foundations, 8 lorry loads.

The last section of the basement walls have been poured along with the pillars and columns.

We use a cardboard shuttering for the columns which is removed after 24 hours.

The basement walls on the first villa are completed and we are moving the shuttering to the second site.