Internal and external floor tiles have been fitted on both villas and the external tiles have been grouted. The entrance in the first villa is finished. There is a marble threshold, a ceiling rose in the center of the ceiling and we have also added coving. The bathrooms are tiled and we are ready to start fitting the baths and shower trays.