Natura Design Lanzarote Builders

Finishing touches – Walk through video

Posted on September 29, 2013 · Posted in Alexis and Julian, Building, Renovations, Tiling, Wetroom

The air-con units have been installed. Finishing of the decorating ready for the kitchen instillation.

 

IMG_4273 IMG_4274 IMG_4275 IMG_4276 IMG_4277 IMG_4278 IMG_4279 IMG_4280 IMG_4281 IMG_4282 IMG_4283 IMG_4284 IMG_4285 IMG_4286 IMG_4270 IMG_4271 IMG_4272