The pool is now finished and we are starting to fill it with water. The filter has been filled with sand and we have plumbed in the heat pump leaving plenty of long lengths of tubing for the future instillation of a salt chlorinator. The electrician will finish off on Monday morning and i am getting him to put the light switch in the sitting room, to turn on the new outside lights, that the ones next to the BBQ, the spots and the lower wall lighting, there is room for one more switch next to the existing one.