The garden has been raked and the Picon is in place, the final painting and touching up is finished. The patio tiling is done and the solar panels have been linked to the swimming pool heat exchanger.

IMG_4508 (1024x683) IMG_4439 (1024x683) IMG_4451 (1024x683) IMG_4466 (1024x683) IMG_4470 (1024x683) IMG_4494 (1024x683) IMG_4495 (1024x683) IMG_4496 (1024x683) IMG_4497 (1024x683) IMG_4501 (1024x683)