Playa Blanca Project Update

By |2009-11-09T13:13:36+00:00November 9th, 2009|Hitesh|

The villas are moving on quickly now, we are repairing the pavements at the entrance of the villas and cleaning up the gardens. Both basements have been plastered and we are now ready to screed the floors. The bathrooms have been grouted and the plumber has now started to install the bathroom suites. Carpentry and

Tiling

By |2009-10-03T14:45:08+00:00October 3rd, 2009|Hitesh, Tiling|

Internal and external floor tiles have been fitted on both villas and the external tiles have been grouted. The entrance in the first villa is finished. There is a marble threshold, a ceiling rose in the center of the ceiling and we have also added coving. The bathrooms are tiled and we are ready to

Playa Blanca Update

By |2009-06-09T09:12:30+00:00June 9th, 2009|Current Projects, Hitesh|

The lower level garden areas are now finished and the top coat of back-fill is used to cover the water tanks and waste pipes. The shuttering has been placed to help protect the stone walls from any falling rocks. We have installed the electrics for the jacuzzis and the water pipes for the pool shower

Playa Blanca Update

By |2009-06-03T10:28:16+00:00June 3rd, 2009|Hitesh|

The Canarian dry stone walls at the front of the villas are now finished. We have built the stone wall by the swimming pools up to the patio floor levels. We can now finish screeding the outside terraces and start laying tiles. The trenches have been dug for the waste water pipes and we are

Lanzarote’s Dry Stone Walls

By |2009-04-21T08:25:02+00:00April 21st, 2009|Dry Stone Walls, Hitesh|

Natural dry stone walls can be seen all over the Island of Lanzarote. In the countryside they create the natural boundaries between fields where the farmers are constantly clearing the ground for their crops. In the villages they line all the road sides and now in a lot of new constructions they are used for