The swimming pools are now finished and full of water.

The plumbing has been tested and the pool filters filled with sand and back-washed thoroughly to remove the finer sand.

The chlorine and pH levels have been adjusted and a floculant added to remove any particles in the water.

We have added the edge tiles to the swimming pools, this obviously have a visual affect but it also makes the swimming pool edge much easier to clean as swimmers leave suntan lotion oil on the waters surface.

The electrics in the garages has to be surface mounted as the walls are solid concrete, we have installed three lights and two plug sockets, one for a future electric moter for the garage door and another for general use.

These internal doors were imported from the mainland, they have a satin finish and come in different colored woods.

The Palacio de Congresos will be built on the sea prominade at Arrecife

An area 15,000 m2 to be built between 2009 – 2013 it was the first prize in the international competition in 2009. Henning Larsen Architects will be partnering local Spanish architect Carlos Morales.

The kitchens are installed ready for the silestone worktops.