postheadericon Natura Design Construction Project Update

The second villa has now been rendered and had its first coat of paint.

The block work for the stairs and balconies has bean completed and ready for rendering and we are currently shuttering up the top of the plastic membrane to keep the damp out of the basement.

natura-design-sl-2.jpg  Block work for the balastades  natura-design-sl.jpg

The plasterers have started on the first villa.

The plaster is sprayed on to the surface of the blocks under extreme pressure and then leveled.

Machine for mixing the plaster  sprayed plaster  Plasterer

The plasterers then have only a few hours to work until the plaster sets hard.

Plastering the ceiling  Builders  Lanzarote builders Natura Design

Then a very fine second application is applied by hand to give the final high quality finish.

Plastering the walls  natura-design-9.jpg  natura-design-7.jpg