We are building two luxury villas with swimming pools and large underground garages in Playa Blanca.

The block-work is now finished, we then render the swimming pool walls and screed the pool base.

It is important to cut away the render around the pool light and inlet valves so that the fiber-glass resin has good contact.

The final structural part of the project are the swimming pools. We have leveled the base and compacted the soil ready for a thin layer of concrete. This gives us a base to work on. A steel mesh is constructed of 12mm steel on top of which we pour approx 20cm thick concrete.

The base is now finished and we are laying the blocks for the sides of the swimming pool.

This is the traditional system for building Lanzarote swimming pools and is used all over Spain. This construction system has been used by Lanzarote Builders for many years.

The shuttering is in place for the balcony floor off the master bedroom and we are putting in the floor levels ready for the concrete.

    

We have now finished all the rendering of the front walls for both villas in Playa Blanca.

   

In this method of plastering a special plaster is used, it has been designed to set quickly after being sprayed on, it is called Yeso Projeccion or Yeso Rapido. When plastering by hand a slow setting plaster must be used, this is called Yeso Lento. A thin top coat of a very fine plaster must be applied after to give the final high quality professional finish. Then when it has completely dried after a week or so you can give the surface a fine sand before painting.

The plaster is sprayed on under compression using a three phase electric generator and plaster pump that is built in to the mixer. The plaster runs through the rubber hose to the spray gun and the plasterer gives the wall an even coat of plaster. Within minutes it has to be leveled and smoothed before it sets. Then after about half an hour the plasterers fill any remaining holes and make the final preparations for the thin topcoat finish.

For more information on Lanzarote Builders you can visite the Natura Design website

The plastering is now finished in the first villa.

 

This has brightened it up and you can get the feel of what the villa will look like finished.

We have nearly finished the damp proofing and are ready to start rendering the front walls leading down to the basements.

   