postheadericon Natura Design – Starting to shutter for the basement ceiling.

We have started to put up the shuttering to support the ceiling

Lanzarote Builders Shuttering for the ceiling Natura Design

The preparation for the screeding of the second villas floor

Floor screeding copy-of-hitesh-9-005.jpg Backfilled the site

The site has been backfilled and the land has been levelled

copy-of-hitesh-9-008.jpg Ground is levelled Building the retaining walls

Lanzarote builders

postheadericon Lanzarote builders Playa Blanca Update

Today we are pouring the final concrete for the completion of the basement walls for the second villa. We will also pour all the supporting columns for the first storey. The technical control and quality control technicians visited the site this morning and gave us the ok to pour the concrete.

Natura Design Lanzarote Builders Pouring the concrete

We have started to backfill the supporting walls. These were first damp-proofed with pitch paint and a special plastic membrane to keep out the water.

Martin Shuttering Concrete lorry

The majority of work is now completed on both of these basements. All the shuttering and cardboard columns have been removed and the concrete floor had been laid. We are now preparing the ramp down to the underground car park.

Natura Design Lanzarote builders The wall are finished Floor is laid

I am pleased with our progress so far, everything has gone smoothly and we are on schedule.

Lanzarote Builders.

postheadericon Playa blanca build starts to take shape

Things are starting to take shape.

We have finished the foundations on the second villa. The concrete has been poured, levelled and then vibrated to take out any air bubbles.

Pouring the foundations The finished foundations Vibrating the concrete
60 cubic metres of concrete have gone into the foundations, 8 lorry loads.

Concrete delivery copy-of-hitesh-7-025.jpg Natura Design

The last section of the basement walls have been poured along with the pillars and columns.

Shuttering panels Natura Design Builders Lanzarote

We use a cardboard shuttering for the columns which is removed after 24 hours.

Vibrating the concrete Lanzarote builders The walls are finished

The basement walls on the first villa are completed and we are moving the shuttering to the second site.

Walls are up Moving the shuttering Shuttering

postheadericon Playa Blanca construction update

The concrete lorry and concrete pump have arrived to start the first section of wall for the basement. We have started with a twenty six metre section of shuttering. The panels are painted with a product to stop them sticking to the cement. The site has been inspected by Applus the technical control company for the seguro decenal and the quality control have taken the concrete samples they need.

Natura design Pumping the concrete Painting the shuttering to stop it sticking

We have now removed the shuttering ready for the next section of wall.

Builders lanzarote lanzarote A finished section of wall

The block work and steel are now finished for the second villa. The concrete will be poured early next week next after the electrician has soldered the copper wire for the earth.